中国电建江西电建公司苏里南达美酒店装修项目总承包项目苏里南达美酒店装修项目施工劳务分包采购项目公开谈判采购公告
| 所在地区: | 江西-- | 发布日期: | 2026年9月8日 |
苏里南达美酒店装修项目施工劳务分包公开谈判采购
Public Negotiation Procurement for Construction Labor Subcontract of Suriname RAMME RESORTS Decoration Project
一、采购类别:(略)
Procurement Category:(略)
二、采购方式:(略)
Procurement Method:(略)
三、采购范围:
Scope of Procurement
采购范围:(略)
1.室内装饰工程施工:(略)
2.活动家具及软装安装工程:(略)
Construction Scope:
The scope of services under this contract covers the licensed Marriott Hotel project located in Suriname, with an area of approximately (略),(略) square meters:
1. Interior Decoration Engineering Construction — Responsible for the full-area decoration construction of the 1st floor, mezzanine and 5th floor of the hotel, including ceiling works (simple gypsum board ceilings, complex gypsum board ceilings, wood-grain transfer aluminum square tube shaped ceilings, etc., including the installation of Φ8 hot-dip galvanized full-threaded hangers and (略)-series hot-dip galvanized light steel keels), wall works (granite wall tiling, wall decorative panel installation, etc.), floor works (laying of (略)mm-thick granite floors, stone floors and plastic roll material floors), door and window works (fabrication and installation of metal door/window casings) and other works (installation of scattered stone items, stone skirting boards, metal skirting boards, etc.), all of which shall be implemented in strict accordance with the construction drawings and technical requirements provided by Party A;
2.Movable Furniture and Soft Decoration Installation Engineering — Responsible for the installation of movable furniture, carpet tiles, curtains and artistic decorative lamps in all areas of the hotel, specifically including the installation of furniture such as bar chairs, office chairs and office desks in the 1st-floor lobby, the laying of various carpet tiles, the installation of curtain tracks and curtains, and the installation and commissioning of artistic decorative lamps. All works shall ensure installation quality meets the hotel’s decorative design standards, and shall coordinate with Party A’s overall construction schedule and comply with on-site management and coordination.
项目部委托的其他工作。
Other works entrusted by the Project Department
四、采购人:(略)
Purchaser:(略)
采购平台:(略)
Procurement Platform:(略)
联系人:(略)
Contact:(略)
联系方式:(略)
Contact Information:(略)
日期:(略)
Date:(略)
响应截止日期:(略)
Response Deadline:(略)
按照客观、公正、公开的原则,本条信息受业主方委托独家指定在中国建设招标网 www.jszhaobiao.com 发布
